From Start To Finish
1Initial Consult
This is the first opportunity for us to discuss your project. It is simply about getting a better understanding of the direction you are going with regard to design.
• Colours
• Any Inspiration - images
• What are the 'must haves'
• Appliances you want to incorporate
• Budget
We will finish off with a measure of your space or go off your house plans.
2Concept Drawings & Quotation
A selection of rendered drawings and elevations will be supplied. Inevitably, there will be some changes and tweaking to make. Once the concept design is agreed upon, we will provide you with a quotation. If you are happy with the price, we will then schedule your works.
3Making A Start
Approximately one week prior to manufacturing, we will visit the site and do a final site measure. Following the site measure, we will put together the final documents that will form your contract with Contrast Interiors.
• Final Design & Quotation - Occasionally, there are slight changes following site measure
• Design Details - In this document we confirm the choices you have made and any special requests
• Contrast Interiors Terms & Conditions
• 50% Deposit Invoice
4Manufacturing
Manufacturing will begin on payment of your deposit invoice. Generally, a Kitchen takes four weeks to manufacture. This timeframe could be more or less depending on the complexity of your project. We recommend that you arrange for your space to be prepared for installation during this time.
• Existing Kitchen removed (if necessary)
• Walls plastered & painted
• Flooring finished where possible
• Wired for new electrical
• Plumbed for new plumbing
5Final Viewing
Prior to installation, we will set up your cabinetry in our factory and arrange a time for you to view the finished product. At this stage, we will forward you a 40% progress invoice and ask that you arrange for payment prior to installation.
6Installation
Your cabinetry will be delivered to site, and our installers will go about installing your brand-new cabinetry. The average Kitchen will take 1-2 days to install. If you have opted for stone or granite benchtops, this will be templated on completion of the cabinetry installation. Stone/Granite benchtops take up to 10 working days to manufacture and 1 day to install. Once complete, a final payment of 10% is due.

